Know the margin at every price point before the fabric is cut.
Costing Sheet builds the cost of each style from its bill of materials, stitching rates and overheads, then shows the margin at MRP, festive sale and end of season. Change a fabric or a vendor and the numbers follow.
TF-FW26-114 · Festive Kurta
Costing Sheet
- Fabric2.4 m cotton-silk₹310
- StitchingJaipur unit CMT₹180
- TrimsButtons, piping, labels₹62
- OverheadPacking, freight, QC₹48
- Cost per piece₹600
Margin by price point
- MRP ₹2,49976%
- Festive sale ₹1,99970%
- End of season ₹1,74966%
TF-FW26-114: cost ₹600, MRP ₹2,499, margin 76% before discounts.
What Costing Sheet does
Built around how a fashion team actually works.
Costs from the tech pack
Fabric consumption and trims come straight from the bill of materials.
Vendor rates
Stitching, embroidery and finishing rates per vendor, per operation.
Overheads included
Packing, freight, QC and wastage added as fixed or percentage lines.
Margin by price point
See margin at MRP, sale and clearance prices, with your target margin flagged.
What-if changes
Try another fabric, vendor or trim and compare before you commit.
Any currency
Cost in rupees and price in rupees or other currencies for export and marketplaces.
How it works
Four steps, one thread.
- 1
Pull
Materials and quantities come in from the tech pack.
- 2
Rate
Add vendor rates and overheads.
- 3
Price
Set MRP and planned discounts to see margins.
- 4
Sign off
Lock the cost sheet so production orders use the agreed numbers.
Inside the record
What a cost sheet holds
Materials
- Fabric, consumption and rate
- Trims, labels and packing
- Wastage allowance
Labour
- Cut, make and trim rate
- Embroidery or print cost
- Wash and finishing
Pricing
- MRP and planned discounts
- Margin at each price point
- Target margin and sign-off
Shared with Jaipur unit
Vendor view
- Tech pack v3Opened 13 Oct
- Size chart · Regular fitOpened 13 Oct
- Proto 2 commentsAcknowledged
- Vendor uploads inline QC photos here
- 4 comments on this style
Questions about Costing Sheet
Can we compare two vendors for the same style?
Yes. Create cost versions per vendor and compare them side by side, including margin at each price point.
Do costs update when the tech pack changes?
Yes. A change to consumption or trims updates a draft cost sheet, while signed-off sheets stay locked until you review them.
Is margin shown before or after discounts?
Both. MRP margin is shown before discounts, and each planned price point shows its own margin.
The collection rail
Five hangers are empty.Your next collection fills them.
Create your first 5 styles free, each with a full tech pack, sample log and costing sheet. Move them from moodboard to rail before you decide on a plan.
- 01
- 02
- 03
- 04
- 05
Tech packs and costing included on all five. Vendors can view what you share.